Roosevelt Island · verified neighbors · free
Neighbor helps neighbor.
A free, verified network just for the Island. Find a last-minute sitter, lend a hand, and buy & sell with people you actually trust.
Join the Island →Always free · Verified neighbors only · Delete your account anytime
The NYC Department of Transportation (DOT) will be conducting test openings of the Roosevelt Island Bridge on: Thursday, 9/17 from 10 AM to 2 PM The rain date is: Friday, 9/18 from 10 AM to 2 PM Please be advised that intermittent bridge closures will occur during this testing period, with each closure lasting approximately 15 minutes. Testing requires a complete closure of the bridge to all vehicular and pedestrian traffic during lifts. We thank you for your patience during this routine testing.
Comments here stay on The Island and do not post to RIOC. Use the source link above to join the original thread.
Sign in to commentNo comments here yet.